Box 16
Container
Contains 89 Results:
Detonation Trap AP-03 - Nitrogen Blanketing of Nitromethane, 1972
File — Box: 16, Folder: 71
Dates:
1972
Detail “A” on Dwg A-429-A4-420 (“Proposed Venting and Blanketing - All Tanks To Be Similar”), undated
File — Box: 16, Folder: 72
Dates:
undated
Engineering Flow Sheet - Nitration Section - 63 Plant Conversion, 1974
File — Box: 16, Folder: 73
Dates:
1974
Plot Plan - Air, Gas, Water, and Power Utilities to Vertical Spray Nitrator Area, 1967
File — Box: 16, Folder: 76
Dates:
1967
Piping Layout - 4-Inch Vertical Spray Nitrator - Nitroparaffin Plant, 1965
File — Box: 16, Folder: 77
Dates:
1965
Piping Elevations - Nitrator Tower - 4-Inch Vertical Spray Nitrator, 1965
File — Box: 16, Folder: 78
Dates:
1965
Piping Details - Section 423 - 1 through 423-10 - 4-Inch Vertical Spray Nitrator, 1965
File — Box: 16, Folder: 79
Dates:
1965
Assembly Details - 4-Inch Vertical Spray Nitrator - Nitroparaffin Plant (A-424-517-A4 and A-424-517-A6), 1964
File — Box: 16, Folder: 80
Dates:
1964